#16
|
||||
|
||||
force dry is not needed with 2k PUs. in hotter summer months here i can usually sand and buff out nibs in about 36 hours and i typically let a frame hang the rafters for 2 weeks before building it or up packing and shipping so it will be a bit tougher.
in my experience force drying(at least over 120f) is a risk of die back and blushing or excessive shrinkage. ymmv |
|
|