Quote:
Originally Posted by John H.
Sounds like you are going for internal hose routing? My best suggestion for this is to have the builder use 2 holes in the stay, have the hose exit near the bb, pass externally under the bb shell and then back into the frame one the lower side of the downtube. In practice this is perfectly clean and you will never see it. DI2 wires will easily find their way around a BB. Fully internal with the hose passing through the BB shell is a pain. Less so with 30mm, but still a pain.
|
This make me remember a Strong frame that was resold here earlier this year due to locations of these holes and business under BB not being OK with PL user who had the frame made.
Di2 certainly will simplify this under BB with only the hydro line in play [under BB] on Di2 bike.
Just a data point from my own PL observations.